Tempo-PCE
Home FAQ Team Contact
All Processes Concrete Waterproofing Masonry Waterproofing Masonry Strengthening Lime Injection Ground Engineering Bricks & Concrete Repairs
All Projects Kingsway, Fire Damage Ladywell Bridge Baynards Bridge Alconbury Weston Bridge Southsea Castle Northen Line Extension Wotton Bridge Thames Tideway
Home Processes All Processes Concrete Waterproofing Masonry Waterproofing Masonry Strengthening Lime Injection Ground Engineering Bricks & Concrete Repairs Projects All Projects Kingsway, Fire Damage Ladywell Bridge Baynards Bridge Alconbury Weston Bridge Southsea Castle Northen Line Extension Wotton Bridge Thames Tideway FAQTeamContact
Tempo-PCE
Injection specialists based in London
Ground consolidation under bridge (Cambdridegshire)
Ground consolidation under bridge (Cambdridegshire)

Ground consolidation under bridge (Cambdridegshire)

PU resin penetrating to surface

PU resin penetrating to surface

Bridges2020Pics-Hiams3.JPG
PU foaming up through lance holes and voids

PU foaming up through lance holes and voids

Ground consolidation injection at bottom of shaft

Ground consolidation injection at bottom of shaft

IMG_1707.jpg
IMG_1648.jpg
IMG_1656.jpg
IMG_1659.jpg
PU injection for header opening

PU injection for header opening

IMG_1649 copy.jpg
Illustration of resin injection steps to facilitate safe excavation around existing services

Illustration of resin injection steps to facilitate safe excavation around existing services

Fast leak in a shaft, Doha

Fast leak in a shaft, Doha

PU injection to coastal piling

PU injection to coastal piling

Reservoir relief pipe: tunnel infill

Reservoir relief pipe: tunnel infill

Section through embankment showing length of outlet tunnel

Section through embankment showing length of outlet tunnel

IMG_0503 copy.jpg
Void filling with PU foam

Void filling with PU foam

P6050053 copy.JPG
P6050089-psded.JPG
Daedalus-after-9555c667-a594-4bf7-a81f-b147792364a2.jpg
Daedalus: completed shaft opening showing consolidated ground

Daedalus: completed shaft opening showing consolidated ground

Water ingress in a gypsum mine

Water ingress in a gypsum mine

PU injection to leak seal/ consolidate ground

PU injection to leak seal/ consolidate ground

0de87022-8e74-4f1e-9cca-881b1b045ada copy.jpg
IMG_7829.jpg
c76f8d30-fe41-4d44-94de-103a9591c504 copy.jpg
Void fill of bridge shaft access, 3D sketch

Void fill of bridge shaft access, 3D sketch

IMG_7875.jpg
Culvert repair

Culvert repair

DSCF0156 copy.JPG
DSCF0172 copy.JPG
F copy.jpg
IMG-20120723-00135 copy.jpg
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
Previous Next
Ground consolidation under bridge (Cambdridegshire)
PU resin penetrating to surface
Bridges2020Pics-Hiams3.JPG
PU foaming up through lance holes and voids
Ground consolidation injection at bottom of shaft
IMG_1707.jpg
IMG_1648.jpg
IMG_1656.jpg
IMG_1659.jpg
PU injection for header opening
IMG_1649 copy.jpg
Illustration of resin injection steps to facilitate safe excavation around existing services
Fast leak in a shaft, Doha
PU injection to coastal piling
Leaking coastal piles, 2/2: leaks sealed with PU resin
Leaking coastal piles, 1/2: water ingress through fixings
Reservoir relief pipe: tunnel infill
Section through embankment showing length of outlet tunnel
IMG_0503 copy.jpg
Void filling with PU foam
P6050053 copy.JPG
P6050089-psded.JPG
Daedalus-after-9555c667-a594-4bf7-a81f-b147792364a2.jpg
Daedalus (1), before: water ingress through sheet piling at bottom of shaft
Daedalus (2): steel cut beyond injection scope
Daedalus (3): further PU injection
Daedalus (5): open heading
Daedalus (4) after: good ground consolidation
Daedalus: completed shaft opening showing consolidated ground
Water ingress in a gypsum mine
PU injection to leak seal/ consolidate ground
0de87022-8e74-4f1e-9cca-881b1b045ada copy.jpg
IMG_7829.jpg
c76f8d30-fe41-4d44-94de-103a9591c504 copy.jpg
Void fill of bridge shaft access, 3D sketch
IMG_7875.jpg
Culvert repair
DSCF0156 copy.JPG
DSCF0172 copy.JPG
F copy.jpg
IMG-20120723-00135 copy.jpg
UTX west London: PU injection to leaking shaft
Heavy water ingress in CrossRail sump chamber (before)
Heavy water ingress in CrossRail sump chamber, sealed with PU (after)
Tempo-PCE
6-7 Neeld Parade (rear),
London HA9 6QU,
United Kingdom
+44 (0)20 3794 4325 info@tempo-pce.com
Hours
 
white_Acclaim logo lrge_300dpi copy.png
 
White_RGB copy.png
Privacy Statement
Processes
Concrete Waterproofing Masonry Waterproofing Masonry Strengthening Lime Injection Ground Engineering
Projects
Kingsway, Fire Damage Ladywell Bridge Baynards Bridge Alconbury Weston Bridge Southsea Castle Northern Line Extension Wotton Bridge Thames Tideway

© Copyright 2025 | All Rights Reserved | Tempo PCE