Tempo-PCE
Home FAQ Team Contact
All Processes Concrete Waterproofing Masonry Waterproofing Masonry Strengthening Lime Injection Ground Engineering Bricks & Concrete Repairs
All Projects Kingsway, Fire Damage Ladywell Bridge Baynards Bridge Alconbury Weston Bridge Southsea Castle Northen Line Extension Wotton Bridge Thames Tideway
Home Processes All Processes Concrete Waterproofing Masonry Waterproofing Masonry Strengthening Lime Injection Ground Engineering Bricks & Concrete Repairs Projects All Projects Kingsway, Fire Damage Ladywell Bridge Baynards Bridge Alconbury Weston Bridge Southsea Castle Northen Line Extension Wotton Bridge Thames Tideway FAQTeamContact
Tempo-PCE
Injection specialists based in London
Lime injection at Milner Hall
Lime injection at Milner Hall

Lime injection at Milner Hall

Injection head connection to packer

Injection head connection to packer

img_3370hr copy.JPG
Drilling into parapet

Drilling into parapet

Filling pump hopper with pre-mixed lime grout

Filling pump hopper with pre-mixed lime grout

Placing lines into pre-drilled brickwork

Placing lines into pre-drilled brickwork

Low-pressure injection into top of parapet

Low-pressure injection into top of parapet

1 2 3 4 5 6 7
Previous Next
Lime injection at Milner Hall
Injection head connection to packer
img_3370hr copy.JPG
Drilling into parapet
Filling pump hopper with pre-mixed lime grout
Placing lines into pre-drilled brickwork
Low-pressure injection into top of parapet
Tempo-PCE
6-7 Neeld Parade (rear),
London HA9 6QU,
United Kingdom
+44 (0)20 3794 4325 info@tempo-pce.com
Hours
 
white_Acclaim logo lrge_300dpi copy.png
 
White_RGB copy.png
Privacy Statement
Processes
Concrete Waterproofing Masonry Waterproofing Masonry Strengthening Lime Injection Ground Engineering
Projects
Kingsway, Fire Damage Ladywell Bridge Baynards Bridge Alconbury Weston Bridge Southsea Castle Northern Line Extension Wotton Bridge Thames Tideway

© Copyright 2025 | All Rights Reserved | Tempo PCE